08 / Briefs
The same service, a different building.
Load, access and failure all change with the building. These briefs take one service into one kind of building and describe what actually decides the job.
Premium apartments
Air conditioning in a premium apartment
An apartment installation is a negotiation with the body corporate, the ceiling and the neighbour, in that order. The equipment is the easy part.
Read the briefWine coolers in a premium apartment
Most wine cooler failures in apartments are installation failures: a unit breathing its own heat inside joinery, or one fighting a kitchen that runs at 28 °C.
Read the briefHeritage homes
Ducted air conditioning in a heritage home
Concealed cooling is the right answer for a heritage house, and the hardest to retrofit. The ceiling void, the beams and the finishes decide the design before any equipment does.
Read the briefWine cellar cooling in a heritage home
The best cellars in Tamboerskloof are the old ones: stone, underground and stable. Cooling one is about holding what the building already does well.
Read the briefPool heat pumps on a heritage property
On a Tamboerskloof slope the pool is often small, shaded in the afternoon and overlooked by neighbours. A heat pump has to be placed for all three.
Read the briefBoutique hotels
Guest room air conditioning in a boutique hotel
A guest judges the room at 02:00. Cooling has to be quiet, draught-free and reliable across rooms that are all slightly different.
Read the briefWine cellar cooling in a boutique hotel
A hotel cellar serves two masters: the list that has to be stored properly and the guests who want to see it. Both are possible if the plant and the room are planned together.
Read the briefKitchen and bar refrigeration maintenance in a boutique hotel
In a hotel the kitchen, the bar, the breakfast room and the cellar all fail at different times. One schedule across all of them is what keeps the guest experience invisible.
Read the briefRestaurants & wine bars
Cold rooms in a restaurant
A restaurant walk-in is sized by the delivery day, not the menu. Get the load and the plant room right and the room becomes boring, which is the goal.
Read the briefIce machines in a restaurant
Ice is a production item with a supply chain of one: water, a filter, a plate and a bin. When it slows, the bar notices before the kitchen does.
Read the briefDucted air conditioning in a restaurant
A full dining room is a heat load that appears at 19:30 and leaves at 23:00. Ducted cooling has to be designed for that hour, not for an empty room at noon.
Read the briefRefrigeration maintenance in a restaurant
A restaurant loses money twice when a unit fails: once on the stock, once on the covers it cannot serve. Maintenance is a trading decision, not a housekeeping one.
Read the briefBuilding not covered?
Tell us the building and the system and we will describe the constraint before quoting anything.